On November 28th, it was learned that the Daan 1H28-4 well, located in the Linjiang syncline of the Daan block in western Chongqing, was successfully drilled.
On November 24th, the "laser rust removal + automatic anti-corrosion" integrated pipeline production line independently developed by Tiancheng Lide Company of Huabei Oilfield
On November 12th, it was learned that a well at the shale oil fracturing site in the main oilfield area of Longdong in Changqing Oilfield successfully completed the carbon dioxide energy-enhanced fracturing operation and simultaneously achieved multiple i…
Copyright © 2025 Lishui Xiuwu Hydraul Ic Co., Ltd Zhejiang ICP Record No. 2025160498-1Legal statement | Privacy Policy | Site map
Copyright © 2025 Lishui Xiuwu Hydraul Ic Co., Ltd
Zhejiang ICP Record No. 2025160498-1