On May 11, it was learned from the Tarim Oilfield that the Keshen 41 well was officially put into production, with 300,000 cubic meters of natural gas produced daily and fed into the West-East Gas Pipeline.
On May 5th, it was learned from Jilin Oilfield that the high-temperature resistant and high-strength water-absorbing swelling particle plugging agent developed by the Oil
On April 20th, 72 sets of camp houses, the first batch of products exported by Huabei Oilfield to Turkey, were successfully delivered by sea.
Copyright © 2025 Lishui Xiuwu Hydraul Ic Co., Ltd Zhejiang ICP Record No. 2025160498-1Legal statement | Privacy Policy | Site map
Copyright © 2025 Lishui Xiuwu Hydraul Ic Co., Ltd
Zhejiang ICP Record No. 2025160498-1